15. Power factor of a power system can be improved by

16. The function of guard ring transmission lines is

17. Use of bundle conductors causes the critical voltage for cornona formation

18. The surge impedance of a long power transmission line is of the order of

19. Booster transformer is located at

20. Surge impedance of a transmission line is given by

21. The string efficiency of an insulator can be increased by